REPUBLIC OF ARMENIA
MINISTRY OF ENVIRONMENT
16.06.2023

Financing:

 KfW Development Bank

 

Successful Contractor:  

 Joint Venture GRAPHSHIN LLC and GREEN OPTION LLC     (Republic of Armenia)

Estimated Contract Start/End:     

 December 2023 – July 2024

Contract Amount:

 410.708,30 EUR

Project Measures:
Within the Support Programme for Protected Areas - Armenia (SPPA-A), the required needs for office space for three local organizations and agencies (Zangezur Biosphere Complex (ZBC) SNCO, Hayantar National Forest Administration – Kapan Branch and the Southern Territorial Basin Management Division of Water Resources Management Agency) were defined.
The works proposed for the rehabilitation of the administrative building are mainly: the re-arrangement of the layout on each floor to provide adequately sized offices, the adaption of the building to Armenian seismic risk reduction standards, the inclusion of a security and fire safety concept, improved accessibility of the building, the renewal of technical installations (heating, cooling, water supply, waste water system, surveillance system, communication, etc.), new finishes (floors, walls, façades, ceilings, etc.) and rehabilitating of the façades, added waterproofing to the roof, enlarged windows to improve natural lighting in the building, the installation of a photovoltaic system.

Initial Tender Notice: 
https://gnumner.minfin.am/website/images/original/c87ed2b1.pdf